After about 200 hours of work all of the floors are in. There's a mixture as described before of natural knees and laminated ones. All are now fastened in with copper nails and roves, and monel screws down low. I made up some copper and some silicon bronze 1/2" bolts for fastening them through the keel. There are several stainless bolts at the moment that are temporary, they will have longer and thicker copper or bronze bolts once the ballast keel and deadwood are added. The whole process is described in this YouTube video.
1 Comment
|
AuthorIan Smith, Boatbuilder (ret'd) Archives
January 2024
Categories |